Vulnerabilities > CVE-2020-14617 - Unspecified vulnerability in Oracle Primavera Unifier

047910
CVSS 5.7 - MEDIUM
Attack vector
NETWORK
Attack complexity
LOW
Privileges required
LOW
Confidentiality impact
HIGH
Integrity impact
NONE
Availability impact
NONE
network
low complexity
oracle

Summary

Vulnerability in the Primavera Unifier product of Oracle Construction and Engineering (component: Platform, Mobile App). Supported versions that are affected are 16.1, 16.2, 17.7-17.12, 18.8 and 19.12; Mobile App: Prior to 20.6. Easily exploitable vulnerability allows low privileged attacker with network access via HTTPS to compromise Primavera Unifier. Successful attacks require human interaction from a person other than the attacker. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera Unifier accessible data. CVSS 3.1 Base Score 5.7 (Confidentiality impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:R/S:U/C:H/I:N/A:N).