Vulnerabilities > CVE-2020-14617 - Unspecified vulnerability in Oracle Primavera Unifier

047910
CVSS 3.5 - LOW
Attack vector
NETWORK
Attack complexity
MEDIUM
Privileges required
SINGLE
Confidentiality impact
PARTIAL
Integrity impact
NONE
Availability impact
NONE
network
oracle

Summary

Vulnerability in the Primavera Unifier product of Oracle Construction and Engineering (component: Platform, Mobile App). Supported versions that are affected are 16.1, 16.2, 17.7-17.12, 18.8 and 19.12; Mobile App: Prior to 20.6. Easily exploitable vulnerability allows low privileged attacker with network access via HTTPS to compromise Primavera Unifier. Successful attacks require human interaction from a person other than the attacker. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera Unifier accessible data. CVSS 3.1 Base Score 5.7 (Confidentiality impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:R/S:U/C:H/I:N/A:N).