Vulnerabilities > CVE-2020-14618 - Unspecified vulnerability in Oracle Primavera Unifier

047910
CVSS 5.9 - MEDIUM
Attack vector
NETWORK
Attack complexity
HIGH
Privileges required
NONE
Confidentiality impact
HIGH
Integrity impact
LOW
Availability impact
NONE
network
high complexity
oracle

Summary

Vulnerability in the Primavera Unifier product of Oracle Construction and Engineering (component: Mobile App). The supported version that is affected is Prior to 20.6. Difficult to exploit vulnerability allows unauthenticated attacker with network access via HTTPS to compromise Primavera Unifier. Successful attacks require human interaction from a person other than the attacker. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera Unifier accessible data as well as unauthorized update, insert or delete access to some of Primavera Unifier accessible data. CVSS 3.1 Base Score 5.9 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:H/PR:N/UI:R/S:U/C:H/I:L/A:N).

Vulnerable Configurations

Part Description Count
Application
Oracle
2