Vulnerabilities > CVE-2018-2966 - Unspecified vulnerability in Oracle Primavera Unifier
Summary
Vulnerability in the Primavera Unifier component of Oracle Construction and Engineering Suite (subcomponent: Core). Supported versions that are affected are 16.x, 17.x and 18.x. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera Unifier. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera Unifier, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized creation, deletion or modification access to critical data or all Primavera Unifier accessible data. CVSS 3.0 Base Score 7.4 (Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:N/I:H/A:N).
Vulnerable Configurations
Nessus
NASL family | CGI abuses |
NASL id | ORACLE_PRIMAVERA_UNIFIER_CPU_JUL_2018.NASL |
description | According to its self-reported version number, the Oracle Primavera Unifier installation running on the remote web server is 16.x prior to 16.2.15.0, 17.x prior to 17.12.7.0, or 18.x prior to 18.7.0.0. It is, therefore, affected by multiple vulnerabilities. Note that Nessus has not tested for these issues but has instead relied only on the application |
last seen | 2020-06-01 |
modified | 2020-06-02 |
plugin id | 111213 |
published | 2018-07-20 |
reporter | This script is Copyright (C) 2018-2019 and is owned by Tenable, Inc. or an Affiliate thereof. |
source | https://www.tenable.com/plugins/nessus/111213 |
title | Oracle Primavera Unifier Multiple Vulnerabilities (July 2018 CPU) |
code |
|